Tengah MRT station
JS3
Tengah
登加
தெங்கா
JS3
Preceding station | Mass Rapid Transit | Following station | ||
---|---|---|---|---|
Choa Chu Kang West towards Choa Chu Kang | Jurong Region Line Future service | Hong Kah towards Boon Lay | ||
Terminus | Tengah Plantation towards Pandan Reservoir |
Location | |
---|---|
Tengah Tengah station in Singapore |
Tengah MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Tengah, Singapore.[1][2][3]
It will be the northern terminus of the East Branch of the Jurong Region line, allowing passengers on the East Branch to change trains for Main Branch train services. Trains entering service at this station will terminate at Pandan Reservoir.
On 9 May 2018, LTA announced that Tengah station would be part of the proposed Jurong Region line (JRL). The station will be constructed as part of Phase 1, JRL (West), consisting of 10 stations between Choa Chu Kang, Boon Lay and Tawas, and is expected to be completed in 2027.[4]
Contract J102 for the design and construction of Tengah Station and associated viaducts was awarded to Shanghai Tunnel Engineering Co. (Singapore) Pte Ltd at a sum of S$465.2 million (US$337.6 million in 2024). Construction will start in 2020, with completion in 2027.[5] The contract also includes the design and construction of Choa Chu Kang station and Choa Chu Kang West station, and associated viaducts and A&A works to the existing Choa Chu Kang station complex.[6]
Initially expected to open in 2026, the restrictions on the construction due to the COVID-19 pandemic has led to delays in the JRL line completion, and the date was pushed to 2027.[7]
The station will be located within the future Tengah planning area.[8][9]
Stage 1 (2027) | |
---|---|
Stage 2 (2028) | |
Stage 3 (2029) |