Rashtreeya Vidyalaya Road metro station

Namma Metro's Green & Yellow Line interchange station

12°55′17″N 77°34′49″E / 12.921458°N 77.580375°E / 12.921458; 77.580375Owned byBangalore Metro Rail Corporation Ltd (BMRCL)Operated byNamma MetroLine(s)Green Line Yellow LinePlatformsSide platform

Platform-1 → Nagasandra
Platform-2Silk Institute

(Yellow Line)
Platform-3 → Train terminates here
Platform-4 → Bommasandra
Platform numbers (TBC)Tracks2ConnectionsMetro interchange Upcoming Yellow LineConstructionStructure typeElevated, Double trackPlatform levels2AccessibleYes Disabled accessOther informationStatusStaffedStation codeRVRHistoryOpened
Preceding station Namma Metro Following station
Jayanagar
towards Nagasandra
Green Line Banashankari
Terminus Yellow Line
(Operational around November 2024)
Ragigudda
towards Bommasandra
Route map
Legend
Madavara
Chikkabidarakallu
Manjunathanagara
Nagasandra
Dasarahalli
Jalahalli
Bus interchange Basaveshwara
Mainline rail interchange Peenya Depot
Peenya Industry
Peenya
Goraguntepalya
Orange Line
Planned
Yeshwanthpur
Yesvantpur Junction railway station
Sandal Soap Factory
Bus interchange Yeshwanthpura TTMC
Mahalakshmi
Parking
Rajajinagar
Mahakavi Kuvempu Road
Srirampura
Mantri Square Sampige Road
Nadaprabhu Kempegowda Stn., Majestic Kempegowda Bus Station Bangalore City railway station
Purple Line
Chickpet
Krishna Rajendra Market
National College
Lalbagh
South End Circle
Jayanagar
Parking Bus interchange Jayanagara TTMC
Rashtreeya Vidyalaya Road
Yellow Line
Under Construction
Banashankari
Bus interchange Banashankari TTMC
Jaya Prakash Nagar
Orange Line
Planned
Yelachenahalli
Konanakunte Cross
Doddakallasandra
Vajarahalli
Thalaghattapura
Silk Institute
Location
Map

Rashtreeya Vidyalaya Road is an elevated interchange metro station on the North-South corridor of the Green Line and the East-West corridor of the upcoming Yellow Line of Namma Metro serving the 5th and 8th Block of Jayanagar area of Bangalore, India. It was opened to the public on 18 June 2017.[1]

As per latest reports, the Yellow Line is stated to be operational around November 2024 due to the upcoming Indian general election which will occur during April–May 2024 and lots of trial runs along with more trainsets are required for commencement of operations.[2][3][4][5][6]

Station layout

Rashtreeya Vidyalaya Road track layout
Legend
P1
P2
Station with two tracks and two side platforms
Rashtreeya Vidyalaya Road track layout **
Legend
to Train Terminates Here
P#
P#
Station with two tracks and two side platforms
**(Upcoming and TBC)
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Silk Institute next station is Banashankari
Platform 1
Northbound
Towards ← Nagasandra next station is Jayanagar
Island platform | P1 & P# doors will open on the left Disabled access
Yellow Line Station Layout & Platform Numbers - (TBC)
Platform #
Southbound
Towards → Bommasandra next station is Ragigudda
Platform #
Northbound
Towards ← Train Terminates Here
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

There are 2 Entry/Exit points – A and B. Commuters can use either of the points for their travel.

  • Entry/Exit point A: Towards Jayanagar 5th Block side
  • Entry/Exit point B: Towards Jayanagar 7th/8th Blocks side with wheelchair accessibility

See also

  • iconBangalore portal
  • iconTransport portal
  • iconEngineering portal

References

  1. ^ "Nagasandra-Puttenahalli Metro line to open by May-end, says KJ George". The Times of India. 3 May 2017. Retrieved 2 July 2017.
  2. ^ "Bengaluru Metro's Yellow Line to Open in November 2024, Tejasvi Surya Shares Key Details". TimesNow. 9 March 2024. Retrieved 10 March 2024.
  3. ^ DHNS. "Bengaluru metro's Yellow Line to start only after general elections". Deccan Herald. Retrieved 14 December 2023.
  4. ^ "RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah". The New Indian Express. Retrieved 11 November 2023.
  5. ^ "Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah". The Times of India. 21 October 2023. ISSN 0971-8257. Retrieved 11 November 2023.
  6. ^ "Bengaluru metro's yellow line connecting Bommasandra to Silk Board to open by February 2024, says MP Tejasvi Surya". Hindustan Times. 6 October 2023. Retrieved 11 November 2023.

External links

Wikimedia Commons has media related to Namma Metro.
Wikivoyage has a travel guide for Bangalore.
  • Bangalore Metro Rail Corporation Ltd. (Official site)
  • UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.
  • v
  • t
  • e
Green Line 2
Operational
Under
Construction
Yellow Line 3
Depot(s)
  • Peenya
  • Hebbagodi
See also
  • *Stations in Italics are Under Construction


Stub icon

This article about a railway station in the Indian state of Karnataka is a stub. You can help Wikipedia by expanding it.

  • v
  • t
  • e