Guru Nanak Dev Thermal Plant
30°14′04″N 74°55′32″E / 30.2345°N 74.9255°E / 30.2345; 74.9255
The Guru Nanak Dev Thermal Plant at Bathinda[2] was one of the three coal-fired thermal power stations in Punjab (the other being at Lehra Mohabat and Ropar[3]). It was a medium-sized power station with four units that were begun to be built in early 1970s and completed in 1982. All total generate up to 460 MW (2x110+2x120 MW) of power that meets the irrigation needs of lower Punjab.[4] Having generated electricity to meet the power demand of Punjab, the thermal plant shut down indefinitely on September 27, 2017.
The plant was named after the first Sikh guru and founder of Sikhism, Guru Nanak.
Capacity
It had an installed capacity of 440 MW. All four units ceased operations in September 2017[5]
Unit No. | Generating Capacity | Commissioned on | Status |
---|---|---|---|
1 | 110 MW | 1974 September | Closed [6] |
2 | 110 MW | 1975 September | Closed [7] |
3 | 120 MW | 1978 March | Closed [7] |
4 | 120 MW | 1979 January | Closed [7] |
See also
References
- ^ "bathinda: Bathinda thermal plant shuts down | Chandigarh News - Times of India". The Times of India.
- ^ "Guru Nanak Thermal Plant". Archived from the original on 28 November 2010. Retrieved 5 July 2010.
- ^ Power Problems
- ^ Thermal Plant and Bathinda's History[permanent dead link]
- ^ Sirhindi, Manish (28 September 2017). "Punjab Shuts Down Its Oldest Thermal Plant". The Times of India. Retrieved 22 June 2020.
- ^ "Guru Nanak Dev Thermal Plant Bhatinda". pspcl.in. Archived from the original on 16 October 2011. Retrieved 13 January 2022.
- ^ a b c "Punjab shuts down its oldest thermal plant | Amritsar News - Times of India". The Times of India.
External links
- Indo-German Power Aggrements
- Lecture by Dr. S. Banerjee on Power Generation in India
- Thermal Plant as seen from Muktsar Road
- v
- t
- e
- Automatic generation control
- Backfeeding
- Base load
- Demand factor
- Droop speed control
- Electric power
- Electric power quality
- Electrical fault
- Energy demand management
- Energy return on investment
- Grid code
- Grid energy storage
- Grid strength
- Home energy storage
- Load-following
- Merit order
- Nameplate capacity
- Peak demand
- Power factor
- Power-flow study
- Repowering
- Utility frequency
- Variability
- Vehicle-to-grid
Non-renewable | |
---|---|
Renewable |
- Demand response
- Distributed generation
- Dynamic demand
- Electric power distribution
- Electric power system
- Electric power transmission
- Electrical busbar system
- Electrical grid
- Electrical substation
- Electricity retailing
- High-voltage direct current
- High-voltage shore connection
- Interconnector
- Load management
- Mains electricity by country
- Overhead power line
- Power station
- Pumped hydro
- Single-wire earth return
- Smart grid
- Super grid
- Transformer
- Transmission system operator (TSO)
- Transmission tower
- Utility pole
devices
and policies
- Availability factor
- Capacity factor
- Carbon offsets and credits
- Cost of electricity by source
- Energy subsidies
- Environmental tax
- Feed-in tariff
- Fossil fuel phase-out
- Load factor
- Net metering
- Pigouvian tax
- Renewable Energy Certificates
- Renewable energy commercialization
- Renewable Energy Payments
- Spark/Dark/Quark/Bark spread
production
- Category
This article about an Indian power station is a stub. You can help Wikipedia by expanding it. |
- v
- t
- e